Challenge
The construction of São Paulo’s tallest tower, standing at 220 metres, presented significant challenges due to the 2,700 m² floor slabs, an 8-day cycle per slab and the absence of standard floor plans, with constant projections, recesses and variations in the architectural plumb line.